I-75 SB (SR-93) over Popash Creek
FairLee County, Florida · 0.1MI. S of SR-78 · Structure no. 120100
- Built
- 1978
- 47 years old, rebuilt 2015
- Condition
- Fair
- inspected May 2024
- Type
- Slab
- Concrete Continuous
- Length
- 406 ft
- 13 main spans
- Daily traffic
- 47,250
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 SB (SR-93) over Popash Creek is a concrete continuous slab carrying I-75 SB (SR-93) over Popash Creek in Lee County, Florida. It was built in 1978 and reconstructed in 2015, so it is 47 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 47,250 vehicles a day, roughly 16% of them trucks, projected to reach 81,979 by 2044. The structure is 406 ft (123.7 m) long and 81 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 SB (SR-93) over Popash Creek built?
It was built in 1978, making it 47 years old in 2025. It was reconstructed in 2015.
What condition is I-75 SB (SR-93) over Popash Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does I-75 SB (SR-93) over Popash Creek carry?
About 47,250 vehicles per day (2024 count), of which roughly 16% are trucks.
How long is I-75 SB (SR-93) over Popash Creek?
The structure is 406 ft (123.7 m) long with a longest span of 32 ft (9.8 m) and a deck 81 ft wide.
Who owns I-75 SB (SR-93) over Popash Creek?
It is owned by the State Highway Agency.