US Bridges

Scrub Jay LN 280.7 over SR 91 Tpk

Good

Lake County, Florida · 1.2 MI S of SR 561 · Structure no. 110613

Built
2023
2 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
222 ft
2 main spans
Daily traffic
455
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

Scrub Jay LN 280.7 over SR 91 Tpk is a prestressed concrete stringer/multi-beam or girder carrying Scrub Jay LN 280.7 over SR 91 Tpk in Lake County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 455 vehicles a day, roughly 5% of them trucks, projected to reach 1,000 by 2042. The structure is 222 ft (67.8 m) long and 56 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesScrub Jay LN 280.7
CrossesSR 91 Tpk
Location1.2 MI S of SR 561
RouteCity Street 0
StateFlorida
Coordinates28.61506, -81.73769
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.3 US tons
Inventory rating43.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length222 ft (67.8 m)
Longest span111 ft (33.9 m)
Deck width56 ft (17.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic455 (2023)
Projected traffic1,000 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Scrub Jay LN 280.7 over SR 91 Tpk built?

It was built in 2023, making it 2 years old in 2025.

What condition is Scrub Jay LN 280.7 over SR 91 Tpk in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Scrub Jay LN 280.7 over SR 91 Tpk carry?

About 455 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Scrub Jay LN 280.7 over SR 91 Tpk?

The structure is 222 ft (67.8 m) long with a longest span of 111 ft (33.9 m) and a deck 56 ft wide.

Who owns Scrub Jay LN 280.7 over SR 91 Tpk?

It is owned by the State Toll Authority.