US Bridges

N Hancock RD 279 over SR 91 Tpk

Good

Lake County, Florida · 0.5 MI N/O Turkey Farm RD · Structure no. 110606

Built
2017
8 years old
Condition
Good
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
245 ft
2 main spans
Daily traffic
75,900
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

N Hancock RD 279 over SR 91 Tpk is a prestressed concrete stringer/multi-beam or girder carrying N Hancock RD 279 over SR 91 Tpk in Lake County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75,900 vehicles a day, roughly 20% of them trucks, projected to reach 131,686 by 2042. The structure is 245 ft (74.7 m) long and 118 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesN Hancock RD 279
CrossesSR 91 Tpk
Location0.5 MI N/O Turkey Farm RD
RouteCounty Highway 0
StateFlorida
Coordinates28.59831, -81.71843
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.2 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length245 ft (74.7 m)
Longest span134 ft (40.9 m)
Deck width118 ft (36 m)
Roadway width102 ft (31 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75,900 (2022)
Projected traffic131,686 by 2042
Trucks20%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was N Hancock RD 279 over SR 91 Tpk built?

It was built in 2017, making it 8 years old in 2025.

What condition is N Hancock RD 279 over SR 91 Tpk in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does N Hancock RD 279 over SR 91 Tpk carry?

About 75,900 vehicles per day (2022 count), of which roughly 20% are trucks.

How long is N Hancock RD 279 over SR 91 Tpk?

The structure is 245 ft (74.7 m) long with a longest span of 134 ft (40.9 m) and a deck 118 ft wide.

Who owns N Hancock RD 279 over SR 91 Tpk?

It is owned by the State Toll Authority.