US Bridges

George J Bean Pkwy over Economy Parking RD

Good

Hillsborough County, Florida · 0.4MI N/O SR616/SPRUCE ST · Structure no. 109921

Built
2023
2 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
118 ft
1 main span
Daily traffic
35,900
2024 count
Owner
Local
Other Local Agency

About this bridge

George J Bean Pkwy over Economy Parking RD is a prestressed concrete stringer/multi-beam or girder carrying George J Bean Pkwy over Economy Parking RD in Hillsborough County, Florida. It was built in 2023, so it is 2 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 35,900 vehicles a day, roughly 2% of them trucks, projected to reach 44,875 by 2044. The structure is 118 ft (36 m) long and 67 ft wide.

CarriesGeorge J Bean Pkwy
CrossesEconomy Parking RD
Location0.4MI N/O SR616/SPRUCE ST
StateFlorida
Coordinates27.96653, -82.53903
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating75.2 US tons
Inventory rating45.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length118 ft (36 m)
Longest span118 ft (36 m)
Deck width67 ft (20.4 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic35,900 (2024)
Projected traffic44,875 by 2044
Trucks2%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerOther Local Agency
Maintained byOther Local Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was George J Bean Pkwy over Economy Parking RD built?

It was built in 2023, making it 2 years old in 2025.

What condition is George J Bean Pkwy over Economy Parking RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does George J Bean Pkwy over Economy Parking RD carry?

About 35,900 vehicles per day (2024 count), of which roughly 2% are trucks.

How long is George J Bean Pkwy over Economy Parking RD?

The structure is 118 ft (36 m) long with a longest span of 118 ft (36 m) and a deck 67 ft wide.

Who owns George J Bean Pkwy over Economy Parking RD?

It is owned by the Other Local Agency.