US Bridges

SR60WB Gjb Pkwy NB over Tia Drainage Canal

Good

Hillsborough County, Florida · At Tia Entrance · Structure no. 100681

Built
2009
16 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
115 ft
1 main span
Daily traffic
16,000
2024 count
Owner
State
State Highway Agency

About this bridge

SR60WB Gjb Pkwy NB over Tia Drainage Canal is a prestressed concrete stringer/multi-beam or girder carrying SR60WB Gjb Pkwy NB over Tia Drainage Canal in Hillsborough County, Florida. It was built in 2009, so it is 16 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,000 vehicles a day, roughly 9% of them trucks, projected to reach 27,760 by 2044. The structure is 115 ft (35.1 m) long and 58 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesSR60WB Gjb Pkwy NB
CrossesTia Drainage Canal
LocationAt Tia Entrance
RouteState Highway 60
StateFlorida
Coordinates27.96075, -82.53889
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.7 US tons
Inventory rating38.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length115 ft (35.1 m)
Longest span115 ft (35.1 m)
Deck width58 ft (17.7 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,000 (2024)
Projected traffic27,760 by 2044
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR60WB Gjb Pkwy NB over Tia Drainage Canal built?

It was built in 2009, making it 16 years old in 2025.

What condition is SR60WB Gjb Pkwy NB over Tia Drainage Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does SR60WB Gjb Pkwy NB over Tia Drainage Canal carry?

About 16,000 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is SR60WB Gjb Pkwy NB over Tia Drainage Canal?

The structure is 115 ft (35.1 m) long with a longest span of 115 ft (35.1 m) and a deck 58 ft wide.

Who owns SR60WB Gjb Pkwy NB over Tia Drainage Canal?

It is owned by the State Highway Agency.