US Bridges

SR616WB-SR60WB over SR-60 WB & George B Pkwy

Good

Hillsborough County, Florida · At Tia Entrance · Structure no. 100679

Built
2009
16 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
240 ft
2 main spans
Daily traffic
13,000
2024 count
Owner
State
State Highway Agency

About this bridge

SR616WB-SR60WB over SR-60 WB & George B Pkwy is a steel continuous stringer/multi-beam or girder carrying SR616WB-SR60WB over SR-60 WB & George B Pkwy in Hillsborough County, Florida. It was built in 2009, so it is 16 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,000 vehicles a day, roughly 9% of them trucks, projected to reach 22,555 by 2044. The structure is 240 ft (73.2 m) long and 44 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR616WB-SR60WB
CrossesSR-60 WB & George B Pkwy
LocationAt Tia Entrance
RouteState Highway 616
StateFlorida
Coordinates27.95908, -82.53844
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.6 US tons
Inventory rating39.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length240 ft (73.2 m)
Longest span121 ft (36.9 m)
Deck width44 ft (13.4 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deck17 ft (5.2 m)

Traffic and service

Average daily traffic13,000 (2024)
Projected traffic22,555 by 2044
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR616WB-SR60WB over SR-60 WB & George B Pkwy built?

It was built in 2009, making it 16 years old in 2025.

What condition is SR616WB-SR60WB over SR-60 WB & George B Pkwy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does SR616WB-SR60WB over SR-60 WB & George B Pkwy carry?

About 13,000 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is SR616WB-SR60WB over SR-60 WB & George B Pkwy?

The structure is 240 ft (73.2 m) long with a longest span of 121 ft (36.9 m) and a deck 44 ft wide.

Who owns SR616WB-SR60WB over SR-60 WB & George B Pkwy?

It is owned by the State Highway Agency.