SR-80 (wb) over C-3 Canal
GoodHendry County, Florida · 10.5 MI E/O SR-29 · Structure no. 070088
- Built
- 2019
- 6 years old
- Condition
- Good
- inspected February 2025
- Type
- Slab
- Concrete Continuous
- Length
- 188 ft
- 5 main spans
- Daily traffic
- 7,250
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR-80 (wb) over C-3 Canal is a concrete continuous slab carrying SR-80 (wb) over C-3 Canal in Hendry County, Florida. It was built in 2019, so it is 6 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 7,250 vehicles a day, roughly 16% of them trucks, projected to reach 12,579 by 2044. The structure is 188 ft (57.2 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-80 (wb) over C-3 Canal built?
It was built in 2019, making it 6 years old in 2025.
What condition is SR-80 (wb) over C-3 Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does SR-80 (wb) over C-3 Canal carry?
About 7,250 vehicles per day (2022 count), of which roughly 16% are trucks.
How long is SR-80 (wb) over C-3 Canal?
The structure is 188 ft (57.2 m) long with a longest span of 37 ft (11.4 m) and a deck 45 ft wide.
Who owns SR-80 (wb) over C-3 Canal?
It is owned by the State Highway Agency.