US Bridges

SR-80 over Goodno Drainage Canal

Good

Hendry County, Florida · 8.4 MI E/O SR-29 · Structure no. 070087

Built
2018
7 years old
Condition
Good
inspected August 2024
Type
Slab
Concrete Continuous
Length
84 ft
3 main spans
Daily traffic
7,250
2024 count
Owner
State
State Highway Agency

About this bridge

SR-80 over Goodno Drainage Canal is a concrete continuous slab carrying SR-80 over Goodno Drainage Canal in Hendry County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,250 vehicles a day, roughly 16% of them trucks, projected to reach 12,579 by 2044. The structure is 84 ft (25.6 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSR-80
CrossesGoodno Drainage Canal
Location8.4 MI E/O SR-29
RouteState Highway 80
StateFlorida
Coordinates26.76822, -81.30406
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.1 US tons
Inventory rating46.4 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length84 ft (25.6 m)
Longest span28 ft (8.5 m)
Deck width51 ft (15.5 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,250 (2024)
Projected traffic12,579 by 2044
Trucks16%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR-80 over Goodno Drainage Canal built?

It was built in 2018, making it 7 years old in 2025.

What condition is SR-80 over Goodno Drainage Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does SR-80 over Goodno Drainage Canal carry?

About 7,250 vehicles per day (2024 count), of which roughly 16% are trucks.

How long is SR-80 over Goodno Drainage Canal?

The structure is 84 ft (25.6 m) long with a longest span of 28 ft (8.5 m) and a deck 51 ft wide.

Who owns SR-80 over Goodno Drainage Canal?

It is owned by the State Highway Agency.