US Bridges

I-95 Nb/Collector over Hendricks/King/Montana

Good

Duval County, Florida · I-95 Nb/Hend/Kings/Mont. · Structure no. 720781

Built
2017
8 years old
Condition
Good
inspected February 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,384 ft
12 main spans
Daily traffic
85,000
2023 count
Owner
State
State Highway Agency

About this bridge

I-95 Nb/Collector over Hendricks/King/Montana is a prestressed concrete stringer/multi-beam or girder carrying I-95 Nb/Collector over Hendricks/King/Montana in Duval County, Florida. It was built in 2017, so it is 8 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 85,000 vehicles a day, roughly 5% of them trucks, projected to reach 147,475 by 2045. The structure is 1,384 ft (421.8 m) long and 121 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-95 Nb/Collector
CrossesHendricks/King/Montana
LocationI-95 Nb/Hend/Kings/Mont.
RouteInterstate 95
StateFlorida
Coordinates30.31422, -81.65269
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.2 US tons
Inventory rating28.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans12 (+20 approach)
Design loadHL 93
Structure length1,384 ft (421.8 m)
Longest span142 ft (43.4 m)
Deck width121 ft (37 m)
Roadway width121 ft (37 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic85,000 (2023)
Projected traffic147,475 by 2045
Trucks5%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 Nb/Collector over Hendricks/King/Montana built?

It was built in 2017, making it 8 years old in 2025.

What condition is I-95 Nb/Collector over Hendricks/King/Montana in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does I-95 Nb/Collector over Hendricks/King/Montana carry?

About 85,000 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is I-95 Nb/Collector over Hendricks/King/Montana?

The structure is 1,384 ft (421.8 m) long with a longest span of 142 ft (43.4 m) and a deck 121 ft wide.

Who owns I-95 Nb/Collector over Hendricks/King/Montana?

It is owned by the State Highway Agency.