US Bridges

SR-113 NB over Merrill Rd.

Good

Duval County, Florida · S. Connector / Merrill RD · Structure no. 720738

Built
2003
22 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
206 ft
1 main span
Daily traffic
15,250
2023 count
Owner
State
State Highway Agency

About this bridge

SR-113 NB over Merrill Rd. is a prestressed concrete stringer/multi-beam or girder carrying SR-113 NB over Merrill Rd. in Duval County, Florida. It was built in 2003, so it is 22 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,250 vehicles a day, roughly 3% of them trucks, projected to reach 26,459 by 2045. The structure is 206 ft (62.8 m) long and 43 ft wide.

CarriesSR-113 NB
CrossesMerrill Rd.
LocationS. Connector / Merrill RD
RouteState Highway 113
StateFlorida
Coordinates30.35246, -81.55236
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating41 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length206 ft (62.8 m)
Longest span206 ft (62.8 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,250 (2023)
Projected traffic26,459 by 2045
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-113 NB over Merrill Rd. built?

It was built in 2003, making it 22 years old in 2025.

What condition is SR-113 NB over Merrill Rd. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does SR-113 NB over Merrill Rd. carry?

About 15,250 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is SR-113 NB over Merrill Rd.?

The structure is 206 ft (62.8 m) long with a longest span of 206 ft (62.8 m) and a deck 43 ft wide.

Who owns SR-113 NB over Merrill Rd.?

It is owned by the State Highway Agency.