I-295 SB (SR-9A) over Csxrr
GoodDuval County, Florida · 0.8 Mi. N. of I-10 · Structure no. 720410
- Built
- 1975
- 50 years old, rebuilt 2017
- Condition
- Good
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 139 ft
- 3 main spans
- Daily traffic
- 47,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-295 SB (SR-9A) over Csxrr is a prestressed concrete stringer/multi-beam or girder carrying I-295 SB (SR-9A) over Csxrr in Duval County, Florida. It was built in 1975 and reconstructed in 2017, so it is 50 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 47,000 vehicles a day, roughly 14% of them trucks, projected to reach 81,545 by 2045. The structure is 139 ft (42.4 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-295 SB (SR-9A) over Csxrr built?
It was built in 1975, making it 50 years old in 2025. It was reconstructed in 2017.
What condition is I-295 SB (SR-9A) over Csxrr in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.
How much traffic does I-295 SB (SR-9A) over Csxrr carry?
About 47,000 vehicles per day (2023 count), of which roughly 14% are trucks.
How long is I-295 SB (SR-9A) over Csxrr?
The structure is 139 ft (42.4 m) long with a longest span of 59 ft (18 m) and a deck 59 ft wide.
Who owns I-295 SB (SR-9A) over Csxrr?
It is owned by the State Highway Agency.