US Bridges

I-95 SB (SR-9) over US-90 (SR-10) Beaver St.

Fair

Duval County, Florida · I-95 SB over Beaver St. · Structure no. 720170

Built
1959
66 years old, rebuilt 1983
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
316 ft
5 main spans
Daily traffic
75,250
2023 count
Owner
State
State Highway Agency

About this bridge

I-95 SB (SR-9) over US-90 (SR-10) Beaver St. is a prestressed concrete stringer/multi-beam or girder carrying I-95 SB (SR-9) over US-90 (SR-10) Beaver St. in Duval County, Florida. It was built in 1959 and reconstructed in 1983, so it is 66 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 75,250 vehicles a day, roughly 8% of them trucks, projected to reach 130,559 by 2045. The structure is 316 ft (96.3 m) long and 68 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-95 SB (SR-9)
CrossesUS-90 (SR-10) Beaver St.
LocationI-95 SB over Beaver St.
RouteInterstate 95
StateFlorida
Coordinates30.33469, -81.67104
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.8 US tons
Inventory rating22.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadH 20
Structure length316 ft (96.3 m)
Longest span87 ft (26.5 m)
Deck width68 ft (20.7 m)
Roadway width65 ft (19.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75,250 (2023)
Projected traffic130,559 by 2045
Trucks8%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 SB (SR-9) over US-90 (SR-10) Beaver St. built?

It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1983.

What condition is I-95 SB (SR-9) over US-90 (SR-10) Beaver St. in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does I-95 SB (SR-9) over US-90 (SR-10) Beaver St. carry?

About 75,250 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is I-95 SB (SR-9) over US-90 (SR-10) Beaver St.?

The structure is 316 ft (96.3 m) long with a longest span of 87 ft (26.5 m) and a deck 68 ft wide.

Who owns I-95 SB (SR-9) over US-90 (SR-10) Beaver St.?

It is owned by the State Highway Agency.