US Bridges

I-95 NB (SR-9) over W. Ashley St.

Good

Duval County, Florida · I-95NB over W. Ashley St. · Structure no. 720169

Built
1959
66 years old, rebuilt 1983
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
122 ft
3 main spans
Daily traffic
75,250
2023 count
Owner
State
State Highway Agency

About this bridge

I-95 NB (SR-9) over W. Ashley St. is a prestressed concrete stringer/multi-beam or girder carrying I-95 NB (SR-9) over W. Ashley St. in Duval County, Florida. It was built in 1959 and reconstructed in 1983, so it is 66 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 75,250 vehicles a day, roughly 8% of them trucks, projected to reach 130,559 by 2045. The structure is 122 ft (37.2 m) long and 83 ft wide. If it were closed, the detour would be 11.2 mi (18 km).

CarriesI-95 NB (SR-9)
CrossesW. Ashley St.
LocationI-95NB over W. Ashley St.
RouteInterstate 95
StateFlorida
Coordinates30.33361, -81.67083
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56 US tons
Inventory rating44 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length122 ft (37.2 m)
Longest span53 ft (16.2 m)
Deck width83 ft (25.4 m)
Roadway width80 ft (24.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic75,250 (2023)
Projected traffic130,559 by 2045
Trucks8%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 NB (SR-9) over W. Ashley St. built?

It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1983.

What condition is I-95 NB (SR-9) over W. Ashley St. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does I-95 NB (SR-9) over W. Ashley St. carry?

About 75,250 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is I-95 NB (SR-9) over W. Ashley St.?

The structure is 122 ft (37.2 m) long with a longest span of 53 ft (16.2 m) and a deck 83 ft wide.

Who owns I-95 NB (SR-9) over W. Ashley St.?

It is owned by the State Highway Agency.