US Bridges

Glden Gt Pky CR886 over Santa Barbara Canal

Good

Collier County, Florida · 1.54 MI E/O I-75 · Structure no. 034845

Built
2024
1 years old
Condition
Good
inspected January 2024
Type
Slab
Concrete
Length
112 ft
3 main spans
Daily traffic
52,000
2024 count
Owner
County
County Highway Agency

About this bridge

Glden Gt Pky CR886 over Santa Barbara Canal is a concrete slab carrying Glden Gt Pky CR886 over Santa Barbara Canal in Collier County, Florida. It was built in 2024, so it is 1 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 52,000 vehicles a day, projected to reach 90,220 by 2044. The structure is 112 ft (34.2 m) long and 98 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesGlden Gt Pky CR886
CrossesSanta Barbara Canal
Location1.54 MI E/O I-75
RouteCounty Highway 886
StateFlorida
Coordinates26.17691, -81.71114
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52 US tons
Inventory rating40.1 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length112 ft (34.2 m)
Longest span39 ft (11.8 m)
Deck width98 ft (29.9 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic52,000 (2024)
Projected traffic90,220 by 2044
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Glden Gt Pky CR886 over Santa Barbara Canal built?

It was built in 2024, making it 1 years old in 2025.

What condition is Glden Gt Pky CR886 over Santa Barbara Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does Glden Gt Pky CR886 over Santa Barbara Canal carry?

About 52,000 vehicles per day (2024 count).

How long is Glden Gt Pky CR886 over Santa Barbara Canal?

The structure is 112 ft (34.2 m) long with a longest span of 39 ft (11.8 m) and a deck 98 ft wide.

Who owns Glden Gt Pky CR886 over Santa Barbara Canal?

It is owned by the County Highway Agency.