Coronado Pkwy EB over Coronado Canal

Fair

Collier County, Florida · 0.2MI E of Santa Barbara · Structure no. 034102

Built
1972
53 years old
Condition
Fair
inspected March 2024
Type
Slab
Prestressed Concrete
Length
88 ft
3 main spans
Daily traffic
1,440
2024 count
Owner
County
County Highway Agency

About this bridge

Coronado Pkwy EB over Coronado Canal is a prestressed concrete slab carrying Coronado Pkwy EB over Coronado Canal in Collier County, Florida. It was built in 1972, so it is 53 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,440 vehicles a day, roughly 10% of them trucks, projected to reach 1,800 by 2042. The structure is 88 ft (26.8 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesCoronado Pkwy EB
CrossesCoronado Canal
Location0.2MI E of Santa Barbara
RouteCounty Highway 0
StateFlorida
Coordinates26.18285, -81.71632
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.7 US tons
Inventory rating34.5 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 20
Structure length88 ft (26.8 m)
Longest span30 ft (9 m)
Deck width31 ft (9.4 m)
Roadway width24 ft (7.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,440 (2024)
Projected traffic1,800 by 2042
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Coronado Pkwy EB over Coronado Canal built?

It was built in 1972, making it 53 years old in 2025.

What condition is Coronado Pkwy EB over Coronado Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Coronado Pkwy EB over Coronado Canal carry?

About 1,440 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Coronado Pkwy EB over Coronado Canal?

The structure is 88 ft (26.8 m) long with a longest span of 30 ft (9 m) and a deck 31 ft wide.

Who owns Coronado Pkwy EB over Coronado Canal?

It is owned by the County Highway Agency.