US Bridges

WB SR-84 over I-95 (sr 9)

Good

Broward County, Florida · I-95 & I-595 Interchange · Structure no. 860690

Built
2022
3 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
209 ft
1 main span
Daily traffic
16,500
2024 count
Owner
State
State Highway Agency

About this bridge

WB SR-84 over I-95 (sr 9) is a steel stringer/multi-beam or girder carrying WB SR-84 over I-95 (sr 9) in Broward County, Florida. It was built in 2022, so it is 3 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,500 vehicles a day, roughly 7% of them trucks, projected to reach 28,628 by 2042. The structure is 209 ft (63.8 m) long and 71 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesWB SR-84
CrossesI-95 (sr 9)
LocationI-95 & I-595 Interchange
RouteState Highway 84
StateFlorida
Coordinates26.08863, -80.16843
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67 US tons
Inventory rating51.5 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length209 ft (63.8 m)
Longest span209 ft (63.8 m)
Deck width71 ft (21.7 m)
Roadway width67 ft (20.3 m)
Vertical clearance over deck20 ft (6.1 m)

Traffic and service

Average daily traffic16,500 (2024)
Projected traffic28,628 by 2042
Trucks7%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB SR-84 over I-95 (sr 9) built?

It was built in 2022, making it 3 years old in 2025.

What condition is WB SR-84 over I-95 (sr 9) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does WB SR-84 over I-95 (sr 9) carry?

About 16,500 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is WB SR-84 over I-95 (sr 9)?

The structure is 209 ft (63.8 m) long with a longest span of 209 ft (63.8 m) and a deck 71 ft wide.

Who owns WB SR-84 over I-95 (sr 9)?

It is owned by the State Highway Agency.