US Bridges

WB SR-84 over R/R & Ramp to I-595

Good

Broward County, Florida · SR-84 & I-95 · Structure no. 860522

Built
1990
35 years old, rebuilt 2022
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Single or Spread
Steel Continuous
Length
280 ft
3 main spans
Daily traffic
14,500
2023 count
Owner
State
State Highway Agency

About this bridge

WB SR-84 over R/R & Ramp to I-595 is a steel continuous box beam or girders - single or spread carrying WB SR-84 over R/R & Ramp to I-595 in Broward County, Florida. It was built in 1990 and reconstructed in 2022, so it is 35 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 14,500 vehicles a day, roughly 7% of them trucks, projected to reach 25,158 by 2042. The structure is 280 ft (85.3 m) long and 72 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesWB SR-84
CrossesR/R & Ramp to I-595
LocationSR-84 & I-95
RouteState Highway 84
StateFlorida
Coordinates26.08844, -80.16928
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.1 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length280 ft (85.3 m)
Longest span120 ft (36.6 m)
Deck width72 ft (21.9 m)
Roadway width69 ft (21 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,500 (2023)
Projected traffic25,158 by 2042
Trucks7%
Lanes on structure5
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway and railroad
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB SR-84 over R/R & Ramp to I-595 built?

It was built in 1990, making it 35 years old in 2025. It was reconstructed in 2022.

What condition is WB SR-84 over R/R & Ramp to I-595 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does WB SR-84 over R/R & Ramp to I-595 carry?

About 14,500 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is WB SR-84 over R/R & Ramp to I-595?

The structure is 280 ft (85.3 m) long with a longest span of 120 ft (36.6 m) and a deck 72 ft wide.

Who owns WB SR-84 over R/R & Ramp to I-595?

It is owned by the State Highway Agency.