US Bridges

I-75SB Ramp H-12 over Snake Creek (C-9) Canal

Good

Broward County, Florida · At Dade County Line · Structure no. 860679

Built
2018
7 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
204 ft
3 main spans
Daily traffic
24,500
2024 count
Owner
State
State Highway Agency

About this bridge

I-75SB Ramp H-12 over Snake Creek (C-9) Canal is a prestressed concrete stringer/multi-beam or girder carrying I-75SB Ramp H-12 over Snake Creek (C-9) Canal in Broward County, Florida. It was built in 2018, so it is 7 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 24,500 vehicles a day, roughly 5% of them trucks, projected to reach 42,508 by 2042. The structure is 204 ft (62.2 m) long and 59 ft wide.

CarriesI-75SB Ramp H-12
CrossesSnake Creek (C-9) Canal
LocationAt Dade County Line
RouteInterstate 75
StateFlorida
Coordinates25.95683, -80.35233
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68.8 US tons
Inventory rating49.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length204 ft (62.2 m)
Longest span71 ft (21.5 m)
Deck width59 ft (18 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic24,500 (2024)
Projected traffic42,508 by 2042
Trucks5%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-75SB Ramp H-12 over Snake Creek (C-9) Canal built?

It was built in 2018, making it 7 years old in 2025.

What condition is I-75SB Ramp H-12 over Snake Creek (C-9) Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does I-75SB Ramp H-12 over Snake Creek (C-9) Canal carry?

About 24,500 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is I-75SB Ramp H-12 over Snake Creek (C-9) Canal?

The structure is 204 ft (62.2 m) long with a longest span of 71 ft (21.5 m) and a deck 59 ft wide.

Who owns I-75SB Ramp H-12 over Snake Creek (C-9) Canal?

It is owned by the State Highway Agency.