I-75 (SR-93) NB over Snake Creek
GoodBroward County, Florida · 0.5 MI N of Tpke Intchg · Structure no. 860328
- Built
- 1982
- 43 years old, rebuilt 2011
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 192 ft
- 3 main spans
- Daily traffic
- 98,323
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-75 (SR-93) NB over Snake Creek is a prestressed concrete stringer/multi-beam or girder carrying I-75 (SR-93) NB over Snake Creek in Broward County, Florida. It was built in 1982 and reconstructed in 2011, so it is 43 years old, older than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 98,323 vehicles a day, roughly 8% of them trucks, projected to reach 170,590 by 2042. The structure is 192 ft (58.5 m) long and 114 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75 (SR-93) NB over Snake Creek built?
It was built in 1982, making it 43 years old in 2025. It was reconstructed in 2011.
What condition is I-75 (SR-93) NB over Snake Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does I-75 (SR-93) NB over Snake Creek carry?
About 98,323 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is I-75 (SR-93) NB over Snake Creek?
The structure is 192 ft (58.5 m) long with a longest span of 64 ft (19.5 m) and a deck 114 ft wide.
Who owns I-75 (SR-93) NB over Snake Creek?
It is owned by the State Highway Agency.