US Bridges

I-75 (SR-93) NB over Snake Creek

Good

Broward County, Florida · 0.5 MI N of Tpke Intchg · Structure no. 860328

Built
1982
43 years old, rebuilt 2011
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
192 ft
3 main spans
Daily traffic
98,323
2024 count
Owner
State
State Highway Agency

About this bridge

I-75 (SR-93) NB over Snake Creek is a prestressed concrete stringer/multi-beam or girder carrying I-75 (SR-93) NB over Snake Creek in Broward County, Florida. It was built in 1982 and reconstructed in 2011, so it is 43 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 98,323 vehicles a day, roughly 8% of them trucks, projected to reach 170,590 by 2042. The structure is 192 ft (58.5 m) long and 114 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-75 (SR-93) NB
CrossesSnake Creek
Location0.5 MI N of Tpke Intchg
RouteInterstate 75
StateFlorida
Coordinates25.95686, -80.35137
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.5 US tons
Inventory rating42.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length192 ft (58.5 m)
Longest span64 ft (19.5 m)
Deck width114 ft (34.7 m)
Roadway width100 ft (30.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic98,323 (2024)
Projected traffic170,590 by 2042
Trucks8%
Lanes on structure7
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-75 (SR-93) NB over Snake Creek built?

It was built in 1982, making it 43 years old in 2025. It was reconstructed in 2011.

What condition is I-75 (SR-93) NB over Snake Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does I-75 (SR-93) NB over Snake Creek carry?

About 98,323 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is I-75 (SR-93) NB over Snake Creek?

The structure is 192 ft (58.5 m) long with a longest span of 64 ft (19.5 m) and a deck 114 ft wide.

Who owns I-75 (SR-93) NB over Snake Creek?

It is owned by the State Highway Agency.