US Bridges

I-75 Express Lanes over C-11 Canal

Good

Broward County, Florida · 0.6 Mile N of Griffin RD · Structure no. 860676

Built
2016
9 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
135 ft
2 main spans
Daily traffic
4,400
2023 count
Owner
State
State Highway Agency

About this bridge

I-75 Express Lanes over C-11 Canal is a prestressed concrete stringer/multi-beam or girder carrying I-75 Express Lanes over C-11 Canal in Broward County, Florida. It was built in 2016, so it is 9 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,400 vehicles a day, roughly 3% of them trucks, projected to reach 7,634 by 2042. The structure is 135 ft (41.1 m) long and 85 ft wide.

CarriesI-75 Express Lanes
CrossesC-11 Canal
Location0.6 Mile N of Griffin RD
RouteInterstate 75
StateFlorida
Coordinates26.06878, -80.35665
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length135 ft (41.1 m)
Longest span89 ft (27 m)
Deck width85 ft (25.9 m)
Roadway width80 ft (24.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,400 (2023)
Projected traffic7,634 by 2042
Trucks3%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn an Interstate toll segment under Secretarial agreement
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-75 Express Lanes over C-11 Canal built?

It was built in 2016, making it 9 years old in 2025.

What condition is I-75 Express Lanes over C-11 Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does I-75 Express Lanes over C-11 Canal carry?

About 4,400 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is I-75 Express Lanes over C-11 Canal?

The structure is 135 ft (41.1 m) long with a longest span of 89 ft (27 m) and a deck 85 ft wide.

Who owns I-75 Express Lanes over C-11 Canal?

It is owned by the State Highway Agency.