US Bridges

SW 36th ST over I-75 (SR-93)

Fair

Broward County, Florida · 0.9MI N of Griffin RD · Structure no. 860346

Built
1984
41 years old
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
413 ft
5 main spans
Daily traffic
7,300
2024 count
Owner
State
State Highway Agency

About this bridge

SW 36th ST over I-75 (SR-93) is a prestressed concrete stringer/multi-beam or girder carrying SW 36th ST over I-75 (SR-93) in Broward County, Florida. It was built in 1984, so it is 41 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,300 vehicles a day, roughly 6% of them trucks, projected to reach 12,666 by 2042. The structure is 413 ft (125.9 m) long and 53 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSW 36th ST
CrossesI-75 (SR-93)
Location0.9MI N of Griffin RD
RouteCity Street 0
StateFlorida
Coordinates26.07492, -80.35981
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.8 US tons
Inventory rating44.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length413 ft (125.9 m)
Longest span120 ft (36.6 m)
Deck width53 ft (16.3 m)
Roadway width46 ft (14.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,300 (2024)
Projected traffic12,666 by 2042
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SW 36th ST over I-75 (SR-93) built?

It was built in 1984, making it 41 years old in 2025.

What condition is SW 36th ST over I-75 (SR-93) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does SW 36th ST over I-75 (SR-93) carry?

About 7,300 vehicles per day (2024 count), of which roughly 6% are trucks.

How long is SW 36th ST over I-75 (SR-93)?

The structure is 413 ft (125.9 m) long with a longest span of 120 ft (36.6 m) and a deck 53 ft wide.

Who owns SW 36th ST over I-75 (SR-93)?

It is owned by the State Highway Agency.