US Bridges

I595 EB to SR84 EB over I595 EB to SR84 EB

Good

Broward County, Florida · 0.5 MI E of University DR · Structure no. 860658

Built
2012
13 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
546 ft
3 main spans
Daily traffic
9,000
2022 count
Owner
State
State Highway Agency

About this bridge

I595 EB to SR84 EB over I595 EB to SR84 EB is a steel continuous stringer/multi-beam or girder carrying I595 EB to SR84 EB over I595 EB to SR84 EB in Broward County, Florida. It was built in 2012, so it is 13 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,000 vehicles a day, roughly 3% of them trucks, projected to reach 15,615 by 2044. The structure is 546 ft (166.4 m) long and 30 ft wide.

CarriesI595 EB to SR84 EB
CrossesI595 EB to SR84 EB
Location0.5 MI E of University DR
RouteInterstate 595
StateFlorida
Coordinates26.09642, -80.24149
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.8 US tons
Inventory rating42.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length546 ft (166.4 m)
Longest span200 ft (61 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic9,000 (2022)
Projected traffic15,615 by 2044
Trucks3%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I595 EB to SR84 EB over I595 EB to SR84 EB built?

It was built in 2012, making it 13 years old in 2025.

What condition is I595 EB to SR84 EB over I595 EB to SR84 EB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does I595 EB to SR84 EB over I595 EB to SR84 EB carry?

About 9,000 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is I595 EB to SR84 EB over I595 EB to SR84 EB?

The structure is 546 ft (166.4 m) long with a longest span of 200 ft (61 m) and a deck 30 ft wide.

Who owns I595 EB to SR84 EB over I595 EB to SR84 EB?

It is owned by the State Highway Agency.