NB SR817/WB I-595 over I-595 (SR-862)

Good

Broward County, Florida · I595/SR817 Interchange · Structure no. 860393

Built
1989
36 years old
Condition
Good
inspected November 2023
Type
Box Beam or Girders - Single or Spread
Steel Continuous
Length
779 ft
4 main spans
Daily traffic
11,000
2022 count
Owner
State
State Highway Agency

About this bridge

NB SR817/WB I-595 over I-595 (SR-862) is a steel continuous box beam or girders - single or spread carrying NB SR817/WB I-595 over I-595 (SR-862) in Broward County, Florida. It was built in 1989, so it is 36 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,000 vehicles a day, roughly 4% of them trucks, projected to reach 19,085 by 2044. The structure is 779 ft (237.4 m) long and 30 ft wide.

CarriesNB SR817/WB I-595
CrossesI-595 (SR-862)
LocationI595/SR817 Interchange
RouteInterstate 595
StateFlorida
Coordinates26.09864, -80.25066
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68.5 US tons
Inventory rating41.4 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length779 ft (237.4 m)
Longest span223 ft (68 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,000 (2022)
Projected traffic19,085 by 2044
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesThird level (interchange)
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NB SR817/WB I-595 over I-595 (SR-862) built?

It was built in 1989, making it 36 years old in 2025.

What condition is NB SR817/WB I-595 over I-595 (SR-862) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does NB SR817/WB I-595 over I-595 (SR-862) carry?

About 11,000 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is NB SR817/WB I-595 over I-595 (SR-862)?

The structure is 779 ft (237.4 m) long with a longest span of 223 ft (68 m) and a deck 30 ft wide.

Who owns NB SR817/WB I-595 over I-595 (SR-862)?

It is owned by the State Highway Agency.