Tpk to EBI595/SR84 over I595 Ramp to SR7
GoodBroward County, Florida · I-595 & SR7 Interchange · Structure no. 860657
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 87 ft
- 1 main span
- Daily traffic
- 22,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Tpk to EBI595/SR84 over I595 Ramp to SR7 is a prestressed concrete stringer/multi-beam or girder carrying Tpk to EBI595/SR84 over I595 Ramp to SR7 in Broward County, Florida. It was built in 2011, so it is 14 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 22,000 vehicles a day, roughly 8% of them trucks, projected to reach 38,170 by 2044. The structure is 87 ft (26.4 m) long and 30 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tpk to EBI595/SR84 over I595 Ramp to SR7 built?
It was built in 2011, making it 14 years old in 2025.
What condition is Tpk to EBI595/SR84 over I595 Ramp to SR7 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.
How much traffic does Tpk to EBI595/SR84 over I595 Ramp to SR7 carry?
About 22,000 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is Tpk to EBI595/SR84 over I595 Ramp to SR7?
The structure is 87 ft (26.4 m) long with a longest span of 87 ft (26.4 m) and a deck 30 ft wide.
Who owns Tpk to EBI595/SR84 over I595 Ramp to SR7?
It is owned by the State Highway Agency.