US Bridges

SB US-441/EB I-595 over US-441 (SR-7)

Good

Broward County, Florida · I-595/SR-7 Interchange · Structure no. 860414

Built
1987
38 years old, rebuilt 2013
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
261 ft
4 main spans
Daily traffic
6,700
2022 count
Owner
State
State Highway Agency

About this bridge

SB US-441/EB I-595 over US-441 (SR-7) is a prestressed concrete stringer/multi-beam or girder carrying SB US-441/EB I-595 over US-441 (SR-7) in Broward County, Florida. It was built in 1987 and reconstructed in 2013, so it is 38 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 6,700 vehicles a day, roughly 8% of them trucks, projected to reach 11,624 by 2044. The structure is 261 ft (79.6 m) long and 43 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesSB US-441/EB I-595
CrossesUS-441 (SR-7)
LocationI-595/SR-7 Interchange
RouteInterstate 595
StateFlorida
Coordinates26.08383, -80.20319
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.8 US tons
Inventory rating38.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHL 93
Structure length261 ft (79.6 m)
Longest span100 ft (30.5 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,700 (2022)
Projected traffic11,624 by 2044
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SB US-441/EB I-595 over US-441 (SR-7) built?

It was built in 1987, making it 38 years old in 2025. It was reconstructed in 2013.

What condition is SB US-441/EB I-595 over US-441 (SR-7) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does SB US-441/EB I-595 over US-441 (SR-7) carry?

About 6,700 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is SB US-441/EB I-595 over US-441 (SR-7)?

The structure is 261 ft (79.6 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.

Who owns SB US-441/EB I-595 over US-441 (SR-7)?

It is owned by the State Highway Agency.