US Bridges

US1 NB to Port Eve over I-595 EB Ramp to 7th Ave

Good

Broward County, Florida · I-595 & Port Everglades · Structure no. 860646

Built
2012
13 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
92 ft
1 main span
Daily traffic
1,300
2022 count
Owner
State
State Highway Agency

About this bridge

US1 NB to Port Eve over I-595 EB Ramp to 7th Ave is a prestressed concrete stringer/multi-beam or girder carrying US1 NB to Port Eve over I-595 EB Ramp to 7th Ave in Broward County, Florida. It was built in 2012, so it is 13 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,300 vehicles a day, roughly 4% of them trucks, projected to reach 2,256 by 2044. The structure is 92 ft (28 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesUS1 NB to Port Eve
CrossesI-595 EB Ramp to 7th Ave
LocationI-595 & Port Everglades
RouteU.S. Route 595
StateFlorida
Coordinates26.08025, -80.1311
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.7 US tons
Inventory rating46.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length92 ft (28 m)
Longest span92 ft (28 m)
Deck width30 ft (9.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,300 (2022)
Projected traffic2,256 by 2044
Trucks4%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was US1 NB to Port Eve over I-595 EB Ramp to 7th Ave built?

It was built in 2012, making it 13 years old in 2025.

What condition is US1 NB to Port Eve over I-595 EB Ramp to 7th Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does US1 NB to Port Eve over I-595 EB Ramp to 7th Ave carry?

About 1,300 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is US1 NB to Port Eve over I-595 EB Ramp to 7th Ave?

The structure is 92 ft (28 m) long with a longest span of 92 ft (28 m) and a deck 30 ft wide.

Who owns US1 NB to Port Eve over I-595 EB Ramp to 7th Ave?

It is owned by the State Highway Agency.