US Bridges

US 441 SR 7 over Dania Cut Off Canal

Good

Broward County, Florida · 1 Mile South of I 595 · Structure no. 860627

Built
2001
24 years old
Condition
Good
inspected October 2023
Type
Slab
Concrete Continuous
Length
105 ft
3 main spans
Daily traffic
56,500
2023 count
Owner
State
State Highway Agency

About this bridge

US 441 SR 7 over Dania Cut Off Canal is a concrete continuous slab carrying US 441 SR 7 over Dania Cut Off Canal in Broward County, Florida. It was built in 2001, so it is 24 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 56,500 vehicles a day, roughly 10% of them trucks, projected to reach 98,028 by 2042. The structure is 105 ft (32 m) long and 120 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesUS 441 SR 7
CrossesDania Cut Off Canal
Location1 Mile South of I 595
RouteU.S. Route 441
StateFlorida
Coordinates26.06611, -80.20778
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86.4 US tons
Inventory rating51.8 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 25 or greater
Structure length105 ft (32 m)
Longest span35 ft (10.7 m)
Deck width120 ft (36.6 m)
Roadway width102 ft (31.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic56,500 (2023)
Projected traffic98,028 by 2042
Trucks10%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 441 SR 7 over Dania Cut Off Canal built?

It was built in 2001, making it 24 years old in 2025.

What condition is US 441 SR 7 over Dania Cut Off Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does US 441 SR 7 over Dania Cut Off Canal carry?

About 56,500 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is US 441 SR 7 over Dania Cut Off Canal?

The structure is 105 ft (32 m) long with a longest span of 35 ft (10.7 m) and a deck 120 ft wide.

Who owns US 441 SR 7 over Dania Cut Off Canal?

It is owned by the State Highway Agency.