US Bridges

SR-842 to SB I-95 over SB I-95 Ramp to I-595

Good

Broward County, Florida · Between SR-842 & SR-736 · Structure no. 860606

Built
1994
31 years old
Condition
Good
inspected February 2024
Type
Box Beam or Girders - Single or Spread
Steel Continuous
Length
632 ft
3 main spans
Daily traffic
11,000
2024 count
Owner
State
State Highway Agency

About this bridge

SR-842 to SB I-95 over SB I-95 Ramp to I-595 is a steel continuous box beam or girders - single or spread carrying SR-842 to SB I-95 over SB I-95 Ramp to I-595 in Broward County, Florida. It was built in 1994, so it is 31 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,000 vehicles a day, roughly 5% of them trucks, projected to reach 19,085 by 2042. The structure is 632 ft (192.5 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR-842 to SB I-95
CrossesSB I-95 Ramp to I-595
LocationBetween SR-842 & SR-736
RouteInterstate 95
StateFlorida
Coordinates26.11288, -80.16937
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.9 US tons
Inventory rating39.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length632 ft (192.5 m)
Longest span263 ft (80.3 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,000 (2024)
Projected traffic19,085 by 2042
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-842 to SB I-95 over SB I-95 Ramp to I-595 built?

It was built in 1994, making it 31 years old in 2025.

What condition is SR-842 to SB I-95 over SB I-95 Ramp to I-595 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does SR-842 to SB I-95 over SB I-95 Ramp to I-595 carry?

About 11,000 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is SR-842 to SB I-95 over SB I-95 Ramp to I-595?

The structure is 632 ft (192.5 m) long with a longest span of 263 ft (80.3 m) and a deck 30 ft wide.

Who owns SR-842 to SB I-95 over SB I-95 Ramp to I-595?

It is owned by the State Highway Agency.