US Bridges

PNR#2 to SB I-95 R over SB I-95 / I-595CONN / RR

Good

Broward County, Florida · I-95 South of SR-842 · Structure no. 860600

Built
1995
30 years old
Condition
Good
inspected December 2023
Type
Box Beam or Girders - Single or Spread
Steel Continuous
Length
1,305 ft
7 main spans
Daily traffic
400
2022 count
Owner
State
State Highway Agency

About this bridge

PNR#2 to SB I-95 R over SB I-95 / I-595CONN / RR is a steel continuous box beam or girders - single or spread carrying PNR#2 to SB I-95 R over SB I-95 / I-595CONN / RR in Broward County, Florida. It was built in 1995, so it is 30 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 400 vehicles a day, roughly 12% of them trucks, projected to reach 694 by 2044. The structure is 1,305 ft (397.8 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesPNR#2 to SB I-95 R
CrossesSB I-95 / I-595CONN / RR
LocationI-95 South of SR-842
RouteInterstate 95
StateFlorida
Coordinates26.11728, -80.16928
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating57.2 US tons
Inventory rating34.2 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length1,305 ft (397.8 m)
Longest span275 ft (83.8 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic400 (2022)
Projected traffic694 by 2044
Trucks12%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway and railroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was PNR#2 to SB I-95 R over SB I-95 / I-595CONN / RR built?

It was built in 1995, making it 30 years old in 2025.

What condition is PNR#2 to SB I-95 R over SB I-95 / I-595CONN / RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does PNR#2 to SB I-95 R over SB I-95 / I-595CONN / RR carry?

About 400 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is PNR#2 to SB I-95 R over SB I-95 / I-595CONN / RR?

The structure is 1,305 ft (397.8 m) long with a longest span of 275 ft (83.8 m) and a deck 31 ft wide.

Who owns PNR#2 to SB I-95 R over SB I-95 / I-595CONN / RR?

It is owned by the State Highway Agency.