US Bridges

I-95 (SR-9) NB over SR-818 (griffin Rd.)

Good

Broward County, Florida · 1.0 Mile N of SR-848 · Structure no. 860555

Built
1989
36 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
180 ft
2 main spans
Daily traffic
105,500
2023 count
Owner
State
State Highway Agency

About this bridge

I-95 (SR-9) NB over SR-818 (griffin Rd.) is a prestressed concrete stringer/multi-beam or girder carrying I-95 (SR-9) NB over SR-818 (griffin Rd.) in Broward County, Florida. It was built in 1989, so it is 36 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 105,500 vehicles a day, roughly 10% of them trucks, projected to reach 183,042 by 2042. The structure is 180 ft (54.9 m) long and 86 ft wide.

CarriesI-95 (SR-9) NB
CrossesSR-818 (griffin Rd.)
Location1.0 Mile N of SR-848
RouteInterstate 95
StateFlorida
Coordinates26.06277, -80.16387
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.8 US tons
Inventory rating45.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length180 ft (54.9 m)
Longest span90 ft (27.4 m)
Deck width86 ft (26.1 m)
Roadway width83 ft (25.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic105,500 (2023)
Projected traffic183,042 by 2042
Trucks10%
Lanes on structure5
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 (SR-9) NB over SR-818 (griffin Rd.) built?

It was built in 1989, making it 36 years old in 2025.

What condition is I-95 (SR-9) NB over SR-818 (griffin Rd.) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does I-95 (SR-9) NB over SR-818 (griffin Rd.) carry?

About 105,500 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is I-95 (SR-9) NB over SR-818 (griffin Rd.)?

The structure is 180 ft (54.9 m) long with a longest span of 90 ft (27.4 m) and a deck 86 ft wide.

Who owns I-95 (SR-9) NB over SR-818 (griffin Rd.)?

It is owned by the State Highway Agency.