I-95 SB to SR 818 over C-11 Dania Cut-Off Canal
FairBroward County, Florida · 0.3 MI N of Griffin RD · Structure no. 860546
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 180 ft
- 3 main spans
- Daily traffic
- 68,000
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I-95 SB to SR 818 over C-11 Dania Cut-Off Canal is a prestressed concrete stringer/multi-beam or girder carrying I-95 SB to SR 818 over C-11 Dania Cut-Off Canal in Broward County, Florida. It was built in 1988, so it is 37 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 68,000 vehicles a day, roughly 6% of them trucks, projected to reach 117,980 by 2042. The structure is 180 ft (55 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-95 SB to SR 818 over C-11 Dania Cut-Off Canal built?
It was built in 1988, making it 37 years old in 2025.
What condition is I-95 SB to SR 818 over C-11 Dania Cut-Off Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does I-95 SB to SR 818 over C-11 Dania Cut-Off Canal carry?
About 68,000 vehicles per day (2024 count), of which roughly 6% are trucks.
How long is I-95 SB to SR 818 over C-11 Dania Cut-Off Canal?
The structure is 180 ft (55 m) long with a longest span of 80 ft (24.4 m) and a deck 43 ft wide.
Who owns I-95 SB to SR 818 over C-11 Dania Cut-Off Canal?
It is owned by the State Highway Agency.