EB 595 to SB 95 over Ramp Anglers + RR

Good

Broward County, Florida · I-95/I-595 Interchange · Structure no. 860540

Built
1988
37 years old
Condition
Good
inspected January 2024
Type
Box Beam or Girders - Single or Spread
Steel Continuous
Length
830 ft
6 main spans
Daily traffic
28,500
2024 count
Owner
State
State Highway Agency

About this bridge

EB 595 to SB 95 over Ramp Anglers + RR is a steel continuous box beam or girders - single or spread carrying EB 595 to SB 95 over Ramp Anglers + RR in Broward County, Florida. It was built in 1988, so it is 37 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 28,500 vehicles a day, roughly 8% of them trucks, projected to reach 49,448 by 2042. The structure is 830 ft (253 m) long and 43 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesEB 595 to SB 95
CrossesRamp Anglers + RR
LocationI-95/I-595 Interchange
RouteInterstate 595
StateFlorida
Coordinates26.08144, -80.17014
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.2 US tons
Inventory rating37.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20 + Mod
Structure length830 ft (253 m)
Longest span178 ft (54.2 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic28,500 (2024)
Projected traffic49,448 by 2042
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway and railroad
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was EB 595 to SB 95 over Ramp Anglers + RR built?

It was built in 1988, making it 37 years old in 2025.

What condition is EB 595 to SB 95 over Ramp Anglers + RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does EB 595 to SB 95 over Ramp Anglers + RR carry?

About 28,500 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is EB 595 to SB 95 over Ramp Anglers + RR?

The structure is 830 ft (253 m) long with a longest span of 178 ft (54.2 m) and a deck 43 ft wide.

Who owns EB 595 to SB 95 over Ramp Anglers + RR?

It is owned by the State Highway Agency.