US Bridges

EB I-595 (sr 862) over I-95/RR/ANGLERS Ave.

Good

Broward County, Florida · I-595 SR-862 over I-95 · Structure no. 860536

Built
1989
36 years old
Condition
Good
inspected January 2024
Type
Box Beam or Girders - Single or Spread
Steel Continuous
Length
1,198 ft
10 main spans
Daily traffic
36,000
2024 count
Owner
State
State Highway Agency

About this bridge

EB I-595 (sr 862) over I-95/RR/ANGLERS Ave. is a steel continuous box beam or girders - single or spread carrying EB I-595 (sr 862) over I-95/RR/ANGLERS Ave. in Broward County, Florida. It was built in 1989, so it is 36 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 36,000 vehicles a day, roughly 8% of them trucks, projected to reach 62,460 by 2042. The structure is 1,198 ft (365 m) long and 59 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEB I-595 (sr 862)
CrossesI-95/RR/ANGLERS Ave.
LocationI-595 SR-862 over I-95
RouteInterstate 595
StateFlorida
Coordinates26.0822, -80.1713
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans10
Design loadHS 20
Structure length1,198 ft (365 m)
Longest span132 ft (40.2 m)
Deck width59 ft (17.9 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deck17 ft (5.1 m)

Traffic and service

Average daily traffic36,000 (2024)
Projected traffic62,460 by 2042
Trucks8%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was EB I-595 (sr 862) over I-95/RR/ANGLERS Ave. built?

It was built in 1989, making it 36 years old in 2025.

What condition is EB I-595 (sr 862) over I-95/RR/ANGLERS Ave. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does EB I-595 (sr 862) over I-95/RR/ANGLERS Ave. carry?

About 36,000 vehicles per day (2024 count), of which roughly 8% are trucks.

How long is EB I-595 (sr 862) over I-95/RR/ANGLERS Ave.?

The structure is 1,198 ft (365 m) long with a longest span of 132 ft (40.2 m) and a deck 59 ft wide.

Who owns EB I-595 (sr 862) over I-95/RR/ANGLERS Ave.?

It is owned by the State Highway Agency.