US Bridges

WB I-595 to SB I95 over SR9 (I-95) & E-N Conn.

Good

Broward County, Florida · I-95 & I-595 Interchange · Structure no. 860539

Built
1990
35 years old
Condition
Good
inspected March 2024
Type
Box Beam or Girders - Single or Spread
Steel Continuous
Length
770 ft
5 main spans
Daily traffic
11,000
2024 count
Owner
State
State Highway Agency

About this bridge

WB I-595 to SB I95 over SR9 (I-95) & E-N Conn. is a steel continuous box beam or girders - single or spread carrying WB I-595 to SB I95 over SR9 (I-95) & E-N Conn. in Broward County, Florida. It was built in 1990, so it is 35 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,000 vehicles a day, roughly 15% of them trucks, projected to reach 19,085 by 2044. The structure is 770 ft (234.6 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesWB I-595 to SB I95
CrossesSR9 (I-95) & E-N Conn.
LocationI-95 & I-595 Interchange
RouteInterstate 595
StateFlorida
Coordinates26.08376, -80.16714
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.1 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length770 ft (234.6 m)
Longest span183 ft (55.9 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deck16 ft (5 m)

Traffic and service

Average daily traffic11,000 (2024)
Projected traffic19,085 by 2044
Trucks15%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkSTRAHNET connector

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB I-595 to SB I95 over SR9 (I-95) & E-N Conn. built?

It was built in 1990, making it 35 years old in 2025.

What condition is WB I-595 to SB I95 over SR9 (I-95) & E-N Conn. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does WB I-595 to SB I95 over SR9 (I-95) & E-N Conn. carry?

About 11,000 vehicles per day (2024 count), of which roughly 15% are trucks.

How long is WB I-595 to SB I95 over SR9 (I-95) & E-N Conn.?

The structure is 770 ft (234.6 m) long with a longest span of 183 ft (55.9 m) and a deck 43 ft wide.

Who owns WB I-595 to SB I95 over SR9 (I-95) & E-N Conn.?

It is owned by the State Highway Agency.