WB I-595 (SR-862) over SW26TERR/NEW RIVER/30AV
GoodBroward County, Florida · 1MI W of I-95 (SR-9) · Structure no. 860427
- Built
- 1987
- 38 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 4,811 ft
- 51 main spans
- Daily traffic
- 109,250
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
WB I-595 (SR-862) over SW26TERR/NEW RIVER/30AV is a prestressed concrete stringer/multi-beam or girder carrying WB I-595 (SR-862) over SW26TERR/NEW RIVER/30AV in Broward County, Florida. It was built in 1987, so it is 38 years old, younger than the Florida average of 41.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 109,250 vehicles a day, roughly 8% of them trucks, projected to reach 189,549 by 2042. The structure is 4,811 ft (1,466.3 m) long and 71 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was WB I-595 (SR-862) over SW26TERR/NEW RIVER/30AV built?
It was built in 1987, making it 38 years old in 2025.
What condition is WB I-595 (SR-862) over SW26TERR/NEW RIVER/30AV in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does WB I-595 (SR-862) over SW26TERR/NEW RIVER/30AV carry?
About 109,250 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is WB I-595 (SR-862) over SW26TERR/NEW RIVER/30AV?
The structure is 4,811 ft (1,466.3 m) long with a longest span of 100 ft (30.6 m) and a deck 71 ft wide.
Who owns WB I-595 (SR-862) over SW26TERR/NEW RIVER/30AV?
It is owned by the State Highway Agency.