US Bridges

I-595 (SR-862) WB over SW 136th Ave.

Good

Broward County, Florida · 7.3 MI W of Fl. Tpk. · Structure no. 860383

Built
1987
38 years old, rebuilt 2013
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
334 ft
3 main spans
Daily traffic
64,750
2023 count
Owner
State
State Highway Agency

About this bridge

I-595 (SR-862) WB over SW 136th Ave. is a prestressed concrete stringer/multi-beam or girder carrying I-595 (SR-862) WB over SW 136th Ave. in Broward County, Florida. It was built in 1987 and reconstructed in 2013, so it is 38 years old, younger than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 64,750 vehicles a day, roughly 9% of them trucks, projected to reach 112,341 by 2045. The structure is 334 ft (101.7 m) long and 83 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-595 (SR-862) WB
CrossesSW 136th Ave.
Location7.3 MI W of Fl. Tpk.
RouteInterstate 595
StateFlorida
Coordinates26.11847, -80.33014
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating42.8 US tons
Inventory rating37.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length334 ft (101.7 m)
Longest span129 ft (39.2 m)
Deck width83 ft (25.3 m)
Roadway width80 ft (24.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic64,750 (2023)
Projected traffic112,341 by 2045
Trucks9%
Lanes on structure5
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-595 (SR-862) WB over SW 136th Ave. built?

It was built in 1987, making it 38 years old in 2025. It was reconstructed in 2013.

What condition is I-595 (SR-862) WB over SW 136th Ave. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does I-595 (SR-862) WB over SW 136th Ave. carry?

About 64,750 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is I-595 (SR-862) WB over SW 136th Ave.?

The structure is 334 ft (101.7 m) long with a longest span of 129 ft (39.2 m) and a deck 83 ft wide.

Who owns I-595 (SR-862) WB over SW 136th Ave.?

It is owned by the State Highway Agency.