US Bridges

I-75 SB SR-93 over US-441 SR-25

Good

Alachua County, Florida · I-75 SB over US-441 · Structure no. 260065

Built
1963
62 years old, rebuilt 1994
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
263 ft
4 main spans
Daily traffic
34,750
2022 count
Owner
State
State Highway Agency

About this bridge

I-75 SB SR-93 over US-441 SR-25 is a prestressed concrete stringer/multi-beam or girder carrying I-75 SB SR-93 over US-441 SR-25 in Alachua County, Florida. It was built in 1963 and reconstructed in 1994, so it is 62 years old, older than the Florida average of 41.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 34,750 vehicles a day, roughly 31% of them trucks, projected to reach 60,291 by 2044. The structure is 263 ft (80.2 m) long and 67 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-75 SB SR-93
CrossesUS-441 SR-25
LocationI-75 SB over US-441
RouteInterstate 75
StateFlorida
Coordinates29.80174, -82.51404
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length263 ft (80.2 m)
Longest span68 ft (20.7 m)
Deck width67 ft (20.5 m)
Roadway width64 ft (19.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic34,750 (2022)
Projected traffic60,291 by 2044
Trucks31%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-75 SB SR-93 over US-441 SR-25 built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1994.

What condition is I-75 SB SR-93 over US-441 SR-25 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does I-75 SB SR-93 over US-441 SR-25 carry?

About 34,750 vehicles per day (2022 count), of which roughly 31% are trucks.

How long is I-75 SB SR-93 over US-441 SR-25?

The structure is 263 ft (80.2 m) long with a longest span of 68 ft (20.7 m) and a deck 67 ft wide.

Who owns I-75 SB SR-93 over US-441 SR-25?

It is owned by the State Highway Agency.