14th St. NB over Lane A-1 NB I-395
FairDistrict of Columbia, District of Columbia · 14th ST over Lane A-1 · Structure no. 1134(OVER A-1)
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 144 ft
- 2 main spans
- Daily traffic
- 40,000
- 2007 count
- Owner
- State
- State Highway Agency
About this bridge
14th St. NB over Lane A-1 NB I-395 is a steel stringer/multi-beam or girder carrying 14th St. NB over Lane A-1 NB I-395 in District of Columbia, District of Columbia. It was built in 1969, so it is 56 years old, younger than the District of Columbia average of 63.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 40,000 vehicles a day, roughly 5% of them trucks, projected to reach 45,000 by 2027. The structure is 144 ft (43.9 m) long and 44 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 14th St. NB over Lane A-1 NB I-395 built?
It was built in 1969, making it 56 years old in 2025.
What condition is 14th St. NB over Lane A-1 NB I-395 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does 14th St. NB over Lane A-1 NB I-395 carry?
About 40,000 vehicles per day (2007 count), of which roughly 5% are trucks.
How long is 14th St. NB over Lane A-1 NB I-395?
The structure is 144 ft (43.9 m) long with a longest span of 73 ft (22.3 m) and a deck 44 ft wide.
Who owns 14th St. NB over Lane A-1 NB I-395?
It is owned by the State Highway Agency.