US Bridges

Southeast Freeway over 3rd Street S.E.

Good

District of Columbia, District of Columbia · 3rd Street S.E. · Structure no. 1110-1

Built
1965
60 years old, rebuilt 2002
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
166 ft
1 main span
Daily traffic
11,000
2018 count
Owner
State
State Highway Agency

About this bridge

Southeast Freeway over 3rd Street S.E. is a steel stringer/multi-beam or girder carrying Southeast Freeway over 3rd Street S.E. in District of Columbia, District of Columbia. It was built in 1965 and reconstructed in 2002, so it is 60 years old, younger than the District of Columbia average of 63.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 11,000 vehicles a day, roughly 2% of them trucks, projected to reach 27,500 by 2030. The structure is 166 ft (50.6 m) long and 22 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSoutheast Freeway
Crosses3rd Street S.E.
Location3rd Street S.E.
RouteInterstate 0_
Coordinates38.88081, -77.00208
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72 US tons
Inventory rating43 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length166 ft (50.6 m)
Longest span166 ft (50.6 m)
Deck width22 ft (6.7 m)
Roadway width20 ft (6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,000 (2018)
Projected traffic27,500 by 2030
Trucks2%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Southeast Freeway over 3rd Street S.E. built?

It was built in 1965, making it 60 years old in 2025. It was reconstructed in 2002.

What condition is Southeast Freeway over 3rd Street S.E. in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Southeast Freeway over 3rd Street S.E. carry?

About 11,000 vehicles per day (2018 count), of which roughly 2% are trucks.

How long is Southeast Freeway over 3rd Street S.E.?

The structure is 166 ft (50.6 m) long with a longest span of 166 ft (50.6 m) and a deck 22 ft wide.

Who owns Southeast Freeway over 3rd Street S.E.?

It is owned by the State Highway Agency.