US Bridges

I-295 Access over Ramp G

Good

District of Columbia, District of Columbia · _ · Structure no. 1030

Built
2021
4 years old
Condition
Good
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
101 ft
1 main span
Daily traffic
1,500
2022 count
Owner
State
State Highway Agency

About this bridge

I-295 Access over Ramp G is a steel stringer/multi-beam or girder carrying I-295 Access over Ramp G in District of Columbia, District of Columbia. It was built in 2021, so it is 4 years old, younger than the District of Columbia average of 63.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, roughly 1% of them trucks, projected to reach 1,600 by 2028. The structure is 101 ft (30.8 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-295 Access
CrossesRamp G
Location_
RouteInterstate 295
Coordinates38.84587, -77.00656
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating66.5 US tons
Inventory rating51 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length101 ft (30.8 m)
Longest span101 ft (30.8 m)
Deck width40 ft (12.2 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2022)
Projected traffic1,600 by 2028
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-295 Access over Ramp G built?

It was built in 2021, making it 4 years old in 2025.

What condition is I-295 Access over Ramp G in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does I-295 Access over Ramp G carry?

About 1,500 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is I-295 Access over Ramp G?

The structure is 101 ft (30.8 m) long with a longest span of 101 ft (30.8 m) and a deck 40 ft wide.

Who owns I-295 Access over Ramp G?

It is owned by the State Highway Agency.