US Bridges

Riverside Drive over Prov & Worc Railroad

Fair

New London County, Connecticut · 100 Ft South of Route 138 · Structure no. 05657

Built
1988
37 years old
Condition
Fair
inspected April 2024
Type
Slab
Prestressed Concrete
Length
55 ft
1 main span
Daily traffic
1,060
2024 count
Owner
Unknown
Unknown

About this bridge

Riverside Drive over Prov & Worc Railroad is a prestressed concrete slab carrying Riverside Drive over Prov & Worc Railroad in New London County, Connecticut. It was built in 1988, so it is 37 years old, younger than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,060 vehicles a day, roughly 7% of them trucks, projected to reach 1,575 by 2044. The structure is 55 ft (16.8 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRiverside Drive
CrossesProv & Worc Railroad
Location100 Ft South of Route 138
RouteCity Street 0
Coordinates41.61399, -72.04995
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating44.3 US tons
Inventory rating34 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length55 ft (16.8 m)
Longest span50 ft (15.2 m)
Deck width37 ft (11.2 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,060 (2024)
Projected traffic1,575 by 2044
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerUnknown
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Riverside Drive over Prov & Worc Railroad built?

It was built in 1988, making it 37 years old in 2025.

What condition is Riverside Drive over Prov & Worc Railroad in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Riverside Drive over Prov & Worc Railroad carry?

About 1,060 vehicles per day (2024 count), of which roughly 7% are trucks.

How long is Riverside Drive over Prov & Worc Railroad?

The structure is 55 ft (16.8 m) long with a longest span of 50 ft (15.2 m) and a deck 37 ft wide.

Who owns Riverside Drive over Prov & Worc Railroad?

It is owned by the Unknown and maintained by the State Highway Agency.