SR 660 over Shetucket River
FairNew London County, Connecticut · 05 MI North of Route 97 · Structure no. 01642
- Built
- 1939
- 86 years old, rebuilt 1988
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 324 ft
- 4 main spans
- Daily traffic
- 2,600
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
SR 660 over Shetucket River is a steel continuous stringer/multi-beam or girder carrying SR 660 over Shetucket River in New London County, Connecticut. It was built in 1939 and reconstructed in 1988, so it is 86 years old, older than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,600 vehicles a day, roughly 5% of them trucks, projected to reach 3,863 by 2040. The structure is 324 ft (98.8 m) long and 34 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 660 over Shetucket River built?
It was built in 1939, making it 86 years old in 2025. It was reconstructed in 1988.
What condition is SR 660 over Shetucket River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does SR 660 over Shetucket River carry?
About 2,600 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is SR 660 over Shetucket River?
The structure is 324 ft (98.8 m) long with a longest span of 80 ft (24.4 m) and a deck 34 ft wide.
Who owns SR 660 over Shetucket River?
It is owned by the State Highway Agency.