Fairview Avenue over Prov & Worc Railroad
FairNew London County, Connecticut · 900 Ft N of I-95 · Structure no. 03664
- Built
- 2002
- 23 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 93 ft
- 1 main span
- Daily traffic
- 5,900
- 2023 count
- Owner
- Unknown
- Unknown
About this bridge
Fairview Avenue over Prov & Worc Railroad is a steel stringer/multi-beam or girder carrying Fairview Avenue over Prov & Worc Railroad in New London County, Connecticut. It was built in 2002, so it is 23 years old, younger than the Connecticut average of 56.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,900 vehicles a day, roughly 5% of them trucks, projected to reach 8,767 by 2043. The structure is 93 ft (28.3 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fairview Avenue over Prov & Worc Railroad built?
It was built in 2002, making it 23 years old in 2025.
What condition is Fairview Avenue over Prov & Worc Railroad in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Fairview Avenue over Prov & Worc Railroad carry?
About 5,900 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Fairview Avenue over Prov & Worc Railroad?
The structure is 93 ft (28.3 m) long with a longest span of 87 ft (26.5 m) and a deck 41 ft wide.
Who owns Fairview Avenue over Prov & Worc Railroad?
It is owned by the Unknown and maintained by the Other Local Agency.