US Bridges

Route 2 over New Eng Central RR

Good

New London County, Connecticut · .7 Mile East of I-395 · Structure no. 00410

Built
1959
66 years old, rebuilt 2015
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
62 ft
1 main span
Daily traffic
17,800
2021 count
Owner
State
State Highway Agency

About this bridge

Route 2 over New Eng Central RR is a steel stringer/multi-beam or girder carrying Route 2 over New Eng Central RR in New London County, Connecticut. It was built in 1959 and reconstructed in 2015, so it is 66 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 17,800 vehicles a day, roughly 9% of them trucks, projected to reach 26,449 by 2041. The structure is 62 ft (18.9 m) long and 136 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRoute 2
CrossesNew Eng Central RR
Location.7 Mile East of I-395
RouteState Highway 2
Coordinates41.54441, -72.09368
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.1 US tons
Inventory rating35.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length62 ft (18.9 m)
Longest span53 ft (16.2 m)
Deck width136 ft (41.4 m)
Roadway width124 ft (37.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,800 (2021)
Projected traffic26,449 by 2041
Trucks9%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 2 over New Eng Central RR built?

It was built in 1959, making it 66 years old in 2025. It was reconstructed in 2015.

What condition is Route 2 over New Eng Central RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does Route 2 over New Eng Central RR carry?

About 17,800 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is Route 2 over New Eng Central RR?

The structure is 62 ft (18.9 m) long with a longest span of 53 ft (16.2 m) and a deck 136 ft wide.

Who owns Route 2 over New Eng Central RR?

It is owned by the State Highway Agency.