US Bridges

Route 2 over New London Tpke

Fair

New London County, Connecticut · .6 MI E of INTERSTATE-395 · Structure no. 00409

Built
1959
66 years old, rebuilt 1990
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
94 ft
1 main span
Daily traffic
16,000
2018 count
Owner
State
State Highway Agency

About this bridge

Route 2 over New London Tpke is a steel stringer/multi-beam or girder carrying Route 2 over New London Tpke in New London County, Connecticut. It was built in 1959 and reconstructed in 1990, so it is 66 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 16,000 vehicles a day, roughly 5% of them trucks, projected to reach 23,774 by 2038. The structure is 94 ft (28.8 m) long and 95 ft wide.

CarriesRoute 2
CrossesNew London Tpke
Location.6 MI E of INTERSTATE-395
RouteState Highway 2
Coordinates41.54441, -72.09564
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating100 US tons
Inventory rating60.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length94 ft (28.8 m)
Longest span90 ft (27.4 m)
Deck width95 ft (28.9 m)
Roadway width88 ft (26.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,000 (2018)
Projected traffic23,774 by 2038
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 2 over New London Tpke built?

It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1990.

What condition is Route 2 over New London Tpke in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Route 2 over New London Tpke carry?

About 16,000 vehicles per day (2018 count), of which roughly 5% are trucks.

How long is Route 2 over New London Tpke?

The structure is 94 ft (28.8 m) long with a longest span of 90 ft (27.4 m) and a deck 95 ft wide.

Who owns Route 2 over New London Tpke?

It is owned by the State Highway Agency.