US Bridges

INTERSTATE-384 EB over Finley Street

Fair

Hartford County, Connecticut · 0.25 MI West of Bolton Tl · Structure no. 03596

Built
1968
57 years old
Condition
Fair
inspected December 2021
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
87 ft
1 main span
Daily traffic
15,300
2021 count
Owner
State
State Highway Agency

About this bridge

INTERSTATE-384 EB over Finley Street is a prestressed concrete stringer/multi-beam or girder carrying INTERSTATE-384 EB over Finley Street in Hartford County, Connecticut. It was built in 1968, so it is 57 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15,300 vehicles a day, roughly 9% of them trucks, projected to reach 22,734 by 2041. The structure is 87 ft (26.5 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesINTERSTATE-384 EB
CrossesFinley Street
Location0.25 MI West of Bolton Tl
RouteInterstate 384
Coordinates41.77035, -72.4731
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Last inspectionDecember 2021
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.1 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length87 ft (26.5 m)
Longest span82 ft (25 m)
Deck width58 ft (17.8 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,300 (2021)
Projected traffic22,734 by 2041
Trucks9%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was INTERSTATE-384 EB over Finley Street built?

It was built in 1968, making it 57 years old in 2025.

What condition is INTERSTATE-384 EB over Finley Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2021.

How much traffic does INTERSTATE-384 EB over Finley Street carry?

About 15,300 vehicles per day (2021 count), of which roughly 9% are trucks.

How long is INTERSTATE-384 EB over Finley Street?

The structure is 87 ft (26.5 m) long with a longest span of 82 ft (25 m) and a deck 58 ft wide.

Who owns INTERSTATE-384 EB over Finley Street?

It is owned by the State Highway Agency.