US Bridges

INTERSTATE-384 WB over SR 534 (camp Meeting Rd)

Fair

Hartford County, Connecticut · 0.7 MI West of Bolton T.L · Structure no. 03594

Built
1968
57 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
133 ft
1 main span
Daily traffic
15,000
2021 count
Owner
State
State Highway Agency

About this bridge

INTERSTATE-384 WB over SR 534 (camp Meeting Rd) is a steel stringer/multi-beam or girder carrying INTERSTATE-384 WB over SR 534 (camp Meeting Rd) in Hartford County, Connecticut. It was built in 1968, so it is 57 years old, older than the Connecticut average of 56.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15,000 vehicles a day, roughly 14% of them trucks, projected to reach 22,289 by 2041. The structure is 133 ft (40.5 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesINTERSTATE-384 WB
CrossesSR 534 (camp Meeting Rd)
Location0.7 MI West of Bolton T.L
RouteInterstate 384
Coordinates41.76815, -72.48155
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.9 US tons
Inventory rating44.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length133 ft (40.5 m)
Longest span124 ft (37.8 m)
Deck width53 ft (16.3 m)
Roadway width50 ft (15.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,000 (2021)
Projected traffic22,289 by 2041
Trucks14%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was INTERSTATE-384 WB over SR 534 (camp Meeting Rd) built?

It was built in 1968, making it 57 years old in 2025.

What condition is INTERSTATE-384 WB over SR 534 (camp Meeting Rd) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does INTERSTATE-384 WB over SR 534 (camp Meeting Rd) carry?

About 15,000 vehicles per day (2021 count), of which roughly 14% are trucks.

How long is INTERSTATE-384 WB over SR 534 (camp Meeting Rd)?

The structure is 133 ft (40.5 m) long with a longest span of 124 ft (37.8 m) and a deck 53 ft wide.

Who owns INTERSTATE-384 WB over SR 534 (camp Meeting Rd)?

It is owned by the State Highway Agency.