County Road 5 over Sullivan Ditch
FairWeld County, Colorado · 100 Ft N of ST HWY 52 · Structure no. ERI005.0-014.0A
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 23 ft
- 1 main span
- Daily traffic
- 774
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
County Road 5 over Sullivan Ditch is a steel stringer/multi-beam or girder carrying County Road 5 over Sullivan Ditch in Weld County, Colorado. It was built in 1978, so it is 47 years old, older than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 774 vehicles a day, roughly 47% of them trucks, projected to reach 1,099 by 2042. The structure is 23 ft (6.9 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 5 over Sullivan Ditch built?
It was built in 1978, making it 47 years old in 2025.
What condition is County Road 5 over Sullivan Ditch in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does County Road 5 over Sullivan Ditch carry?
About 774 vehicles per day (2023 count), of which roughly 47% are trucks.
How long is County Road 5 over Sullivan Ditch?
The structure is 23 ft (6.9 m) long with a longest span of 21 ft (6.3 m) and a deck 32 ft wide.
Who owns County Road 5 over Sullivan Ditch?
It is owned by the Town or Township Highway Agency.