US Bridges

SH 52 Ml over Lower Boulder Canal

Fair

Weld County, Colorado · 4.1 MI E of JCT US 287 · Structure no. D-16-W

Built
1963
62 years old
Condition
Fair
inspected March 2023
Type
Culvert
Concrete
Length
33 ft
1 main span
Daily traffic
14,000
2020 count
Owner
State
State Highway Agency

About this bridge

SH 52 Ml over Lower Boulder Canal is a concrete culvert carrying SH 52 Ml over Lower Boulder Canal in Weld County, Colorado. It was built in 1963, so it is 62 years old, older than the Colorado average of 42.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 14,000 vehicles a day, roughly 5% of them trucks, projected to reach 18,340 by 2040. The structure is 33 ft (10 m) long and 51 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSH 52 Ml
CrossesLower Boulder Canal
Location4.1 MI E of JCT US 287
RouteState Highway 52A
Coordinates40.08743, -105.02527
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating85.6 US tons
Inventory rating51.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length33 ft (10 m)
Longest span33 ft (10 m)
Deck width51 ft (15.4 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,000 (2020)
Projected traffic18,340 by 2040
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 52 Ml over Lower Boulder Canal built?

It was built in 1963, making it 62 years old in 2025.

What condition is SH 52 Ml over Lower Boulder Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does SH 52 Ml over Lower Boulder Canal carry?

About 14,000 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is SH 52 Ml over Lower Boulder Canal?

The structure is 33 ft (10 m) long with a longest span of 33 ft (10 m) and a deck 51 ft wide.

Who owns SH 52 Ml over Lower Boulder Canal?

It is owned by the State Highway Agency.