Redland Pkwy Ramp over Terrain and Leach Creek
FairMesa County, Colorado · I-70B and Redlands Pkwy · Structure no. GRJ-E.96-24.05
- Built
- 1983
- 42 years old
- Condition
- Fair
- inspected February 2024
- Type
- Box Beam or Girders - Single or Spread
- Steel Continuous
- Length
- 442 ft
- 3 main spans
- Daily traffic
- 3,808
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Redland Pkwy Ramp over Terrain and Leach Creek is a steel continuous box beam or girders - single or spread carrying Redland Pkwy Ramp over Terrain and Leach Creek in Mesa County, Colorado. It was built in 1983, so it is 42 years old, younger than the Colorado average of 42.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,808 vehicles a day, roughly 5% of them trucks, projected to reach 4,456 by 2042. The structure is 442 ft (134.7 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Redland Pkwy Ramp over Terrain and Leach Creek built?
It was built in 1983, making it 42 years old in 2025.
What condition is Redland Pkwy Ramp over Terrain and Leach Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Redland Pkwy Ramp over Terrain and Leach Creek carry?
About 3,808 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is Redland Pkwy Ramp over Terrain and Leach Creek?
The structure is 442 ft (134.7 m) long with a longest span of 155 ft (47.2 m) and a deck 30 ft wide.
Who owns Redland Pkwy Ramp over Terrain and Leach Creek?
It is owned by the City or Municipal Highway Agency.